Exabytes - Scheduled Maintenance (Hard Drives Upgrade at US Windows 2003)

Dear Valued Client,

Following the hard disk upgrade perform on 07 June 2008 on the Windows 2003 hosted at our US data center to a bigger capacity hard
drive.
Maintenance Date: 07 June 2008
Maintenance Time Start: 10.00PM MST
Expected ETA: 4 Hours

==========================
Maintenance Effect:
==========================
We estimate this maintenance will take about 4-5 hours. During the maintenance, your web, email, ftp, MYSQL will be inaccessible for a period of up to 4-5 hours. Additionally, as the server involved is hosting the Helm Control Panel, the control panel will also be unavailable during the maintenance time.

==========================
Servers Affected:
==========================
Venus – 72.18.131.252 (Helm Control Panel, www, ftp, mysql)

For precaution measures, we strongly recommend you to generate a copy of your own backup prior to this maintenance.

If you need further information and clarification regarding this maintenance or if you experience difficulties after the maintenance period, please do not hesitate to contact us via helpdesk at https://support.exabytes.com/help/, or email support@exabytes.com.

Best Regards,

Support Team
......................................
Technical Department
Exa Bytes Network Private Limited

Web: http://www.exabytes.com | http://www.exabytes.com.my
Email: support@exabytes.com
Helpdesk: http://support.exabytes.com